BS 7121-5 PDF

BS Code of practice for safe use of cranes. Tower cranes. standard by BSI Group, 04/28/ View all product details. Most Recent. Track It. Find the most up-to-date version of BS at Engineering BS BRITISH STANDARDCode of practice for safe use of .. BSI •9 BS Complex liftIf the lifting operation is.

Author: Zulkim Malazragore
Country: New Zealand
Language: English (Spanish)
Genre: Technology
Published (Last): 25 July 2014
Pages: 173
PDF File Size: 4.95 Mb
ePub File Size: 4.41 Mb
ISBN: 438-4-25229-528-2
Downloads: 77928
Price: Free* [*Free Regsitration Required]
Uploader: Ner

Alternatively, other audio or visual methods may be used.

On completion of the test any load limits altered to facilitate the test should be reset to the rated load and a thorough examination of the crane should be carried out. This enables them to ensure that they are familiar with the constraints of the site such as road access for crane components and installation equipment, laydown areas, other cranes on site, oversailing cranes on adjacent sites, adjacent railway lines and other site activities that could impinge on the erection, dismantling or alteration operation.

During the carrying out of the lifting operation, hand signals and any voice instruction to the crane operator s should only be given by one person at a time. Maintenance of climbing equipment General The effective maintenance of climbing equipment plays a significant part in the safe and sb completion of tower crane climbing operations.

Once installed around the crane tower the equipment should be inspected again to ensure that it is complete and ready for use. The assistance of the manufacturer or design authority should be sought to determine the vulnerable parts of the structure.

Search all products by. In all cases the lifting operations should be planned by the Appointed Person.

BS 7121-2-5:2012

Search the history of over billion web pages on the Internet. Table 1 gives the minimum number of operators required for continuous single shift operation of a given number of tower cranes. In this case they 71215- be treated as mobile cranes for thorough examination in accordance with BS NOTE Hazards can be from surrounding buildingsor overground or underground services.

  CLASIFICACION DE HINCHEY PARA DIVERTICULITIS PDF

The same principles should be applied when the operations are carried out at a temporary site, for example construction, or when the crane is a permanent fixture, for example in a factory or at a dock. It is essential that personnel are instructed in the correct use of the appropriate personal protective equipment provided. All distances should be measured at ground level from a position estimated by eye to 7121-55 vertically below the outermost conductor at a tower or pole position and should 721-5 an allowance for the load.

BS 7121-5:2006

7121–5 High strength friction grip bolts should not be reused once a joint has 71215 dismantled. Consultation between the designers of the structure and the person planning the climbing operation should take place at the earliest opportunity as substantial internal bracing might be required to transfer the tie forces to a strong point in the structure. All possible events should be included in the risk assessment and contingency arrangements drawn up and recorded in the method statement.

Compliance with a British Standard cannot confer immunity from legal obligations. Where tower cranes inter-arc, a vertical distance should be maintained to prevent collisions. Except bss permitted under the Copyright, Designs and Patents Act no extract may be reproduced, stored in a retrieval system bd transmitted in any form or by any means — electronic, photocopying, recording or otherwise — without prior written permission from BSI. Overturning moments are resisted by either placing ballast on the top of the base or fastening the corners of the cruciform to the supporting structure.

Mobile cranesBSSpecification for automatic safe load indicatorsBSCode of practice for earthingBSCode of practice for selection, use and maintenance of personal fall protection systems and equipment for use in the workplaceBS ENCranes safety — Requirements for health andsafety — Limiting and indicating devicesBS EN Any rescue procedure should be properly planned, taking into account the reasons why the carrier is stranded at height and any need for urgent action.

  EMBRIOLOGIA HUMANA LANGMAN PDF

The appointed person should also take into consideration hazards identified by the overall site risk assessments. The lifting points on ballast blocks should be inspected regularly to ensure that they have not deteriorated and are fit for use.

There can be four single wheels on smaller machines or more usually four double wheel bogeys. To achieve and maintain a safe system of work for the implementation of a permit system several conditions need to be met and these should include the following: The jib could be single- or multi-component, and if multi-component, could be articulated goose necked or telescopic.

Your basket is empty. 7211-5 is envisaged that a full treatment will be given in a future publication.

BS – Code of practice for safe use of cranes. Tower cranes – BSI British Standards

Evidence that members of the erection team are medically fit to carry out their duties should be obtained at not more that five yearly intervals. Many training organizations acknowledge this and run short courses for those with experience, recognizing that less time is necessary for training in the fundamental aspects.

Employers should be satisfied that the employee has had appropriate training and is competent to do 7121–5 job. These might include choosing a unique frequency to avoid interference from other sites, ensuring that batteries are fully charged and that spare handsets are available in case of breakdown.